Sourcegulldocs

Roadmap

Planned work, in the order it is expected to land. Each item lists its goal, design, the code it touches, how it is tested and when it is done. Items stay within the fixed decisions: one binary, PostgreSQL only, GitLab, GitHub and Gitea.

Nothing is planned right now. CI runs on a self-hosted runner: only the release workflow starts on its own (on v* tags); every other check runs locally with scripts/dev, or by hand.

Only work that has not shipped is listed here. When an item (or a phase of one) is done, it is removed, and what it added is described in the user docs where needed.


Candidates

Not planned until asked for: organizations and teams, and repository-scoped code intelligence policies, in the configuration as code resources file; teams synced from GitHub teams and Gitea organization teams (as own.syncTeamsFromGitLabGroups does for GitLab groups); a default permissions sync interval that scales with the number of private repositories; requiring encryption keys, which would remove the action job path that watch HTTP actions use on installs without keys (cm_action_jobs).

Edit this page on GitHub